Case studies
Petrochemical · Cartagena, Colombia

Integrated Energy Manager for Petrochemical Plant

Integrated energy manager for the Cartagena plant, with MCC upgraded to Rockwell, industrial Ethernet network, and expansion of the MIOBOX platform.

MIOBOX
Energy Manager
ControlLogix
Process Unit
Rockwell
Smart Loads
Sector
Petrochemical
Location
Cartagena, Colombia
Client
Cabot

Challenge

To modernize the motor control center, migrating from E1 to Rockwell E300 technology, and implement energy and asset management tools at the Cartagena plant.

Approach

  • Update of smart loads and power monitors.
  • Incorporation of Powerflex 525 and 753 variable speed drives.
  • Installation of SMC-50 soft starter.
  • Deployment of industrial Ethernet network with Stratix 5800 switches.
  • Implementation of ControlLogix 5580 process unit.
  • Expansion of the MIOBOX energy management platform and plant historian.
  • Specialized engineering and training for plant personnel.

Results

Expanded energy management platform, with real-time monitoring of plant loads.

Technologies
Rockwell ControlLogix 5580Powerflex 525/753SMC-50Stratix 5800FactoryTalk View SEMIOBOX
Your project is next

Have a process to measure or automate?

We assess your plant and propose a clear roadmap. Reply within 24 business hours.