MIOBOX Comprehensive Renovation of Substation 2 with MIOBOX
Comprehensive renovation of substation 2, with 440/220 Vac panels, capacitor banks, and per-circuit measurement linked to MIOBOX, under RETIE standard.
Every intervention starts with a diagnosis and ends in numbers: less downtime, energy under control and processes visible in real time. These are some of the projects we have delivered for industry in Colombia and the region.
MIOBOX Comprehensive renovation of substation 2, with 440/220 Vac panels, capacitor banks, and per-circuit measurement linked to MIOBOX, under RETIE standard.
Allen Bradley Allen Bradley controller (Ecopetrol Vendor List) that integrates LACT unit and Master Station signals to the plant BPCS, suitable for Oil & Gas.
S7-1500 Modernization of extruder 27 control with Siemens S7-1500 PLC, distributed I/O ET200SP, and HMI, recovering reliability and production.
E300 Migration from E1 Plus (discontinued) relays to E300 intelligent relays and plant SCADA update, enhancing reliability and real-time monitoring.
MIOBOX Renovation of substation 1 with 440/220 Vac panels, capacitor banks and measurement linked to MIOBOX, under RETIE standard, eliminating energy losses.
MIOBOX Integrated energy manager for the Cartagena plant, with MCC upgraded to Rockwell, industrial Ethernet network, and expansion of the MIOBOX platform.
Real time Drying system control upgrade with real-time monitoring, recovering traceability of process variables, under RETIE standard.
3 Climate-controlled shelter preserving the environment for the drives of extruders 21, 9 and 5, eliminating overtemperature faults and machine stoppages.
HMI Technological upgrade of the cutter control after controller failures, with new controller, HMI, and control logic adapted to the machine.
SCADA Migration of the InTouch SCADA, running on a damaged panel PC, to a new Siemens supervisory platform, restoring system operability.
Rockwell Migration of the encapsulating machine's control system to Rockwell technology, restoring process availability and reliability.
Rockwell New Rockwell control system for sand filters, with installation under RETIE standard, eliminating process information losses.
Automatic Automatic transfer system linked to a backup generator for the administrative building, ensuring continuity during power outages.
Recloser Recloser system to provide the substation with its own protection against temporary faults, enhancing supply reliability.
3.5MVA Regularization of load increase from 2.5 to 3.5 MVA and installation of the medium voltage metering system before the operator, under RETIE standard.
SF6 SOCOL SF6 disconnector to protect the main transformer and provide independent switching from the free zone substation.
Low voltage Supply and integration of low voltage distribution switchboards under current regulations, delivered turnkey.
We assess your plant and propose a clear roadmap. Reply within 24 business hours.